Way overdue things could have been a whole lot different if this was at the beginning.
How to get investors back and to stay ? No one will wait 3 months for each hole to be done around 2000m was drilled for the past 11 month. And must have cost a fortune as seems all we got done was that drilling and a desk top scoping study as we have not seen any details of that study.
Looks like we are off to a better start for 2022 and maybe soon people will realise this CLA has some very good projects and has solid resources.
- Forums
- ASX - By Stock
- CLA
- Ann: Celsius Engages New Drilling Contractor for MCB Project
Ann: Celsius Engages New Drilling Contractor for MCB Project, page-3
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CLA (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.27M |
Open | High | Low | Value | Volume |
1.0¢ | 1.1¢ | 1.0¢ | $56.91K | 5.691M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 2866640 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 8348899 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 150000 | 0.011 |
5 | 2966395 | 0.010 |
17 | 11230589 | 0.009 |
11 | 2520574 | 0.008 |
11 | 6127131 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 8348899 | 15 |
0.012 | 10620673 | 11 |
0.013 | 2071500 | 4 |
0.014 | 1700000 | 3 |
0.015 | 1650000 | 4 |
Last trade - 16.10pm 04/06/2024 (20 minute delay) ? |
|
|||||
Last
1.0¢ |
  |
Change
0.000 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
1.0¢ | 1.0¢ | 1.0¢ | 468425 | ||
Last updated 15.32pm 04/06/2024 ? |
Featured News
CLA (ASX) Chart |