I was a millwright in California ( repairing and installing and maintaining large industrial machinery ) now a proto type design engineer that works with my own patents in house and am also a graduate valuer , so I look at it from my own perspective of how long it takes to design engineer and then install pilot plants
To me ABX is like watching paint dry in how long it takes to get their Alcore batch reactor installed which is why I bought into this stock , and where are the results ?
- Forums
- ASX - By Stock
- ABX
- Ann: CEO Presentation - International Mining and Resources Confer
Ann: CEO Presentation - International Mining and Resources Confer, page-6
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ABX (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.0¢ |
Change
-0.002(3.85%) |
Mkt cap ! $12.50M |
Open | High | Low | Value | Volume |
5.2¢ | 5.2¢ | 5.0¢ | $5.567K | 110.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 210430 | 4.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.0¢ | 57755 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 210430 | 0.048 |
1 | 21522 | 0.046 |
2 | 224246 | 0.045 |
4 | 70004 | 0.044 |
1 | 23833 | 0.042 |
Price($) | Vol. | No. |
---|---|---|
0.050 | 57755 | 1 |
0.052 | 219998 | 2 |
0.053 | 40000 | 1 |
0.054 | 200000 | 1 |
0.056 | 89700 | 2 |
Last trade - 13.10pm 11/06/2024 (20 minute delay) ? |
Featured News
ABX (ASX) Chart |