So mid-2016 to finish the detailed design.
How long after that for:
(1) ordering, delivery and onshore testing of parts
(2) construction
(3) Finding a weather window
(4) testing offshore
(5) going live and grid connection.
My guess: 2018
So mid-2016 to finish the detailed design. How long after that...