MGT 2.08% 24.5¢ magnetite mines limited.

Ann: Chairman's Address and Presentation to 2021 AGM, page-26

  1. 90 Posts.
    lightbulb Created with Sketch. 79
    Iron Bridge has been a major stuff up. Design shortcomings, contractor dramas, shirt changes etc. They’ve had a turnstile of workers go through that joint. Similar to what happened with the Inpex Ichthys LNG project in darwin and what’s currently happening at Rio Tinto’s Gudai-Darri Iron Ore Project in the Pilbara.

    One of the major benefits of MGT’s route to production is the simplicity of their mining plan. Starting off small and building up through modular design takes away the risk of having too many different contractors on site all working on top of each other, building the same thing. Once the foundation, inital plant and mine structure is built, MGT can then add extra benefication modules, ROM’s, transfer stations, conveyors, TOL’s and rail.
 
watchlist Created with Sketch. Add MGT (ASX) to my watchlist
(20min delay)
Last
24.5¢
Change
0.005(2.08%)
Mkt cap ! $25.07M
Open High Low Value Volume
24.0¢ 24.5¢ 24.0¢ $5.642K 23.50K

Buyers (Bids)

No. Vol. Price($)
1 9582 23.0¢
 

Sellers (Offers)

Price($) Vol. No.
24.5¢ 9993 1
View Market Depth
Last trade - 13.09pm 29/08/2024 (20 minute delay) ?
MGT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.