For info:
A respondent on a UK BB has met with Andrew Teo whilst on holiday in Perth and includes the following in his feedback:
"Andrew Teo does not claim to be a mining engineer but the work on the L8 shaft is to open up the size of the shaft to accommodate bigger ore lifts. This can't be done whilst the mine is operating so it was decided to add 2 weeks on to the Christmas shut down for this to be done. In the long term this will be beneficial."
CPDLC
- Forums
- ASX - By Stock
- Ann: Chairman's Address to Shareholders
For info: A respondent on a UK BB has met with Andrew Teo whilst...
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add X64 (ASX) to my watchlist
(20min delay)
|
|||||
Last
57.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $129.8M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
X64 (ASX) Chart |
Day chart unavailable