The Mandurah car park RFT had some very specific engineering and architectural requirements, such as a design life of 50 years minimum and the location and geometry of the ramp. The temporary car park is at grade.
I’d be very surprised if the ParkD system ticks many of the PTA’s RFT boxes.
- Forums
- ASX - By Stock
- Ann: Chairman's Address to Shareholders
The Mandurah car park RFT had some very specific engineering and...
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PKD (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.12M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 350000 | 2.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 7643 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 350000 | 0.028 |
1 | 249473 | 0.027 |
1 | 40000 | 0.025 |
1 | 86956 | 0.023 |
1 | 47619 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 7643 | 1 |
0.035 | 66000 | 1 |
0.045 | 134717 | 1 |
0.046 | 130000 | 1 |
0.047 | 40000 | 1 |
Last trade - 10.06am 21/05/2024 (20 minute delay) ? |
Featured News
PKD (ASX) Chart |
Day chart unavailable
The Watchlist
AUQ
ALARA RESOURCES LIMITED
Stephen Gethin, Non-Executive Director & Chairman
Stephen Gethin
Non-Executive Director & Chairman
Previous Video
Next Video
SPONSORED BY The Market Online