Maybe its XST that is misrepresenting the matter, as Mosman was clear that the operator had done certain things to change the proposed well.
- Forums
- ASX - By Stock
- Ann: Champion Project Farm-in Termination
Maybe its XST that is misrepresenting the matter, as Mosman was...
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
Add XST (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.893M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
XST (ASX) Chart |
Day chart unavailable