and if they had put in a production drive 1 year ago it would have been in the wrong place.
Maybe the board as much as you and I despised them at the time ( the friggin royalty drama ) know a bit more about scheduling a MRE and time lines and geological modeling than me or you ?
Now with the new drive going past 4P , WW , and Pepper we can probably fill a mill from 6 headings with high grade ore rather than a mix of NN ore and mouth wash from the open pit and possibly the NN OC .
So now the NPV is derisked , probably running lower quartile , and probably worth another $1.5 Billion (guessing) .
Lets bitch about it though as fills up the HC thread with drama
- Forums
- ASX - By Stock
- Ann: Change in substantial holder notice from RMS
and if they had put in a production drive 1 year ago it would...
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.30 |
Change
0.020(1.57%) |
Mkt cap ! $1.440B |
Open | High | Low | Value | Volume |
$1.28 | $1.33 | $1.27 | $4.278M | 3.305M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 21246 | $1.28 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.30 | 14419 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 21246 | 1.280 |
2 | 50682 | 1.275 |
1 | 30682 | 1.270 |
3 | 60682 | 1.265 |
3 | 79000 | 1.260 |
Price($) | Vol. | No. |
---|---|---|
1.295 | 14419 | 1 |
1.300 | 41982 | 3 |
1.305 | 55682 | 3 |
1.310 | 74766 | 3 |
1.320 | 8864 | 1 |
Last trade - 16.10pm 09/10/2024 (20 minute delay) ? |
Featured News
SPR (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online