GRL 6.25% 1.5¢ godolphin resources limited

IMO, we will have to wait for the scoping study to be completed...

  1. 219 Posts.
    lightbulb Created with Sketch. 28
    IMO, we will have to wait for the scoping study to be completed to gain a better understanding of potential pathways to economic extraction. We'll need to increase the cut-off grade and increase the deposit size to compensate for that.

    The "high-grade" component of Narraburra (20Mt @ 1,079ppm TREO using a 600ppm cutoff) is fine. If we can get that up to 100Mt, we will have a viable operation, IMO. But we will definitely need to lift to cut-off grade to at least 500ppm TREO.
 
watchlist Created with Sketch. Add GRL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.