PEN 4.55% 11.5¢ peninsula energy limited

Ann: Change in substantial holding, page-36

  1. 13,363 Posts.
    lightbulb Created with Sketch. 11

    Nothing at allto do with Gus. PEN stated they planned on being ready for production in QTR2 2015, this they still do and I believe can easily achieve.

    It is the final inspection making it QTR3, not PEN. Remains to be seen if tvat can be brought forward however I wouldn't bank on it.

    Also construction to production has 3/5ths of nothing to do with him. This will be controlled by the Project Manager and EPC Engineer, not Gus.
 
watchlist Created with Sketch. Add PEN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.