PEN 3.77% $1.53 peninsula energy limited

Nothing at allto do with Gus. PEN stated they planned on being...

  1. 13,368 Posts.
    lightbulb Created with Sketch. 16

    Nothing at allto do with Gus. PEN stated they planned on being ready for production in QTR2 2015, this they still do and I believe can easily achieve.

    It is the final inspection making it QTR3, not PEN. Remains to be seen if tvat can be brought forward however I wouldn't bank on it.

    Also construction to production has 3/5ths of nothing to do with him. This will be controlled by the Project Manager and EPC Engineer, not Gus.
 
watchlist Created with Sketch. Add PEN (ASX) to my watchlist
(20min delay)
Last
$1.53
Change
-0.060(3.77%)
Mkt cap ! $244.2M
Open High Low Value Volume
$1.59 $1.61 $1.52 $1.438M 928.9K

Buyers (Bids)

No. Vol. Price($)
1 17081 $1.53
 

Sellers (Offers)

Price($) Vol. No.
$1.56 11500 2
View Market Depth
Last trade - 16.10pm 24/01/2025 (20 minute delay) ?
PEN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.