Nothing at allto do with Gus. PEN stated they planned on being ready for production in QTR2 2015, this they still do and I believe can easily achieve.
It is the final inspection making it QTR3, not PEN. Remains to be seen if tvat can be brought forward however I wouldn't bank on it.
Also construction to production has 3/5ths of nothing to do with him. This will be controlled by the Project Manager and EPC Engineer, not Gus.
- Forums
- ASX - By Stock
- Ann: Change in substantial holding
PEN
peninsula energy limited
Add to My Watchlist
0.00%
!
62.0¢

Nothing at allto do with Gus. PEN stated they planned on being...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
62.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $99.19M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PEN (ASX) Chart |
Day chart unavailable
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Dr Michael Thurn, CEO & MD
Dr Michael Thurn
CEO & MD
SPONSORED BY The Market Online