I have made a few rough calculations.Am I right? Get back to me!
The margin in q2 was A$23 per tonne.
600 kt should be sold in q3.
231 kt of this was already produced in q2, but not transported to the port and not shipped.
The production costs of AUD 33 million were already incurred in q2.
That means, with an unchanged margin
370 kt * 23 A$ = 8 million A$
231 kt * 23 A$ = 5 mill A$
+ 33 million A$
I arrive at a cash inflow of approx. 46 million A$ for q3.
This does not take into account
- falling costs per tonne, as they produce more in the same time
- falling costs, as the Sky conveyor belt comes on stream
- higher share of coking coal
what do you think?
- Forums
- ASX - By Stock
- BCB
- Ann: Change in substantial holding
Ann: Change in substantial holding, page-23
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BCB (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.2¢ |
Change
0.002(3.33%) |
Mkt cap ! $173.7M |
Open | High | Low | Value | Volume |
6.0¢ | 6.2¢ | 6.0¢ | $21.36K | 351.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 231153 | 6.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.2¢ | 2630 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 231153 | 0.061 |
6 | 488150 | 0.060 |
2 | 102118 | 0.059 |
1 | 60000 | 0.058 |
1 | 72666 | 0.057 |
Price($) | Vol. | No. |
---|---|---|
0.062 | 7843 | 2 |
0.063 | 130000 | 2 |
0.065 | 324210 | 4 |
0.066 | 155875 | 1 |
0.068 | 483658 | 3 |
Last trade - 11.46am 06/06/2024 (20 minute delay) ? |
|
|||||
Last
6.2¢ |
  |
Change
0.002 ( 3.33 %) |
|||
Open | High | Low | Volume | ||
6.1¢ | 6.2¢ | 6.1¢ | 164246 | ||
Last updated 12.06pm 06/06/2024 ? |
Featured News
BCB (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non-Executive Director
Simon Kidston
Non-Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online