MLX 0.00% 39.5¢ metals x limited

Hv/substation and vent system should be completed this quarter I...

  1. 103 Posts.
    lightbulb Created with Sketch. 141
    Hv/substation and vent system should be completed this quarter I believe.
    We just came off the back of a 4 day underground shut, in which they fully rebuilt the underground crusher, so the HV power commissioning was coincided with the shutdown.
    I believe they will fire up the fans for a test run when the power proves sufficient from the switch yard now the shuts over and everything has been turned on.
    Paste plant is heavily relied on interstate Labor so might scrap in.
    DYOR NFA
    Last edited by Bilge: 15/08/22
 
watchlist Created with Sketch. Add MLX (ASX) to my watchlist
(20min delay)
Last
39.5¢
Change
0.000(0.00%)
Mkt cap ! $357.9M
Open High Low Value Volume
39.5¢ 39.5¢ 38.5¢ $618.4K 1.579M

Buyers (Bids)

No. Vol. Price($)
4 143887 39.0¢
 

Sellers (Offers)

Price($) Vol. No.
39.5¢ 6251 2
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
40.0¢
  Change
0.000 ( 1.37 %)
Open High Low Volume
39.0¢ 40.0¢ 38.8¢ 923266
Last updated 15.59pm 14/06/2024 ?
MLX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.