Ahhh the trick is in the spent ore stockpile? I assume the cost assigned to this ore is quite low, and is a hang over from the Tucano acquisition. As it is fed through the mill it is slowly being replaced by freshly mined oxide and sulphide ores which are based on current costs. If I am right I wouldn't think the increase in the stockpile cost is a cause for concern.
Thoughts anyone?