I didn't see any mention of Hole 6 being drilled in the last report dated 12-Nov-20. I wouldn't think Hole 5 will be completed until perhaps 20-Nov-20 if you allow 30 metres per day of drilling. Hole 5 probably started drilling about 11-Nov-20. I am not sure what the target depth of Hole 5 is actually but would assume it would be greater than 300 m.
- Forums
- ASX - By Stock
- AZS
- Ann: Change of Director's Interest Notice
Ann: Change of Director's Interest Notice, page-11
-
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZS (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LGP
LITTLE GREEN PHARMA LTD
Paul Long, CEO
Paul Long
CEO
Previous Video
Next Video
SPONSORED BY The Market Online