I didn't see any mention of Hole 6 being drilled in the last report dated 12-Nov-20. I wouldn't think Hole 5 will be completed until perhaps 20-Nov-20 if you allow 30 metres per day of drilling. Hole 5 probably started drilling about 11-Nov-20. I am not sure what the target depth of Hole 5 is actually but would assume it would be greater than 300 m.