Hey Alex,
There isn't a problem with the PPP.. it's been operational for months and producing hydrogen and graphite.
At the moment they are trying to get it into continuous operation mode.
Now given the whole concept of methane cracking is not a new one. That is, it's been done for years using other catalysts like tin etc, that cost more so they need to be recovered in the process to bring the cost down and still don't compare to cost steam reformation production.
These other cracking plants operate in continuous operation. The technology exists. It's refining it that is happening now. Once continuous operation happens we are away.
From a post in the last few days (May have even been yesterday), someone stated they had contacted hazer, and they confirmed they were on schedule to deliver continuous operation by Q4.
I agree mate, that it's hard to watch sp tank to low 40s even high 30s.. but once this goes it'll be like the deep water horizon.
That may be October, November, December, or possibly next year.
And that's investing..
- Forums
- ASX - By Stock
- HZR
- Ann: Change of Registered Office
Ann: Change of Registered Office, page-8
-
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HZR (ASX) to my watchlist
(20min delay)
|
|||||
Last
31.0¢ |
Change
0.010(3.33%) |
Mkt cap ! $71.33M |
Open | High | Low | Value | Volume |
30.0¢ | 31.0¢ | 29.0¢ | $19.16K | 63.60K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 134965 | 30.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
31.5¢ | 1600 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 134965 | 0.305 |
4 | 7842 | 0.300 |
1 | 166 | 0.295 |
3 | 24523 | 0.290 |
2 | 31041 | 0.285 |
Price($) | Vol. | No. |
---|---|---|
0.315 | 1600 | 1 |
0.320 | 78620 | 2 |
0.325 | 20047 | 3 |
0.330 | 7001 | 4 |
0.335 | 300 | 1 |
Last trade - 16.10pm 11/09/2024 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |