EMH european metals holdings limited

DFS mid 2025 Highlights• New Processing Plant site confirmed at...

  1. 216 Posts.
    lightbulb Created with Sketch. 50
    DFS mid 2025 eek.png

    Highlights
    • New Processing Plant site confirmed at Prunéřov EPR1
    • New site has benefits in respect to construction costs, waste management, access to utilitiesand transport links and logistics, and geotechnical characteristics.
    • Work on updating the DFS to include the revised project configuration has alreadycommenced with results expected to be released in mid-2025.
    • Engineering work has continued, in parallel to finalising the process plant location, tooptimise mining and processing Capex and Opex, including potential for increasedproduction, and confirmation of changes to FECAB for flotation.
    • Extensive stakeholder engagement in respect to the EPR1 site.

    https://hotcopper.com.au/data/attachments/6637/6637434-deecb7ad6c58c816679c1e4a08ccd2a8.jpg
    https://hotcopper.com.au/data/attachments/6637/6637436-716ebc85ab3253d6f7d5d80eaa809d16.jpg
    https://hotcopper.com.au/data/attachments/6637/6637445-3b65d2a551f880ec7b47cf3f4e14be52.jpg
    I like pictures
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
19.0¢
Change
-0.005(2.56%)
Mkt cap ! $39.41M
Open High Low Value Volume
19.0¢ 20.0¢ 19.0¢ $7.64K 39.62K

Buyers (Bids)

No. Vol. Price($)
2 71717 19.0¢
 

Sellers (Offers)

Price($) Vol. No.
20.0¢ 100000 1
View Market Depth
Last trade - 14.58pm 16/06/2025 (20 minute delay) ?
EMH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.