EMH european metals holdings limited

Ann: Cinovec Project Update, page-48

  1. 170 Posts.
    lightbulb Created with Sketch. 48
    https://ekolist.cz/cz/zpravodajstvi/zpravy/spolecnost-zverejnila-podrobnosti-ke-zpracovani-lithia-vytezeneho-v-krusnych-horach

    Found this. It's about the cable car that is supposed to take the ore from the mine entrance through the forest to the loading station (and from there to Prunerov, 60 km away, to the factory).

    I measured the cable car (or elevated railway - we're talking about 50-meter-high masts between the trees, or 25 meters if at treetop height, possibly also a conveyor belt, probably on the ground then): The conveyor is a total of about 8 km through the forest, 6 of which through the "real" Ore Mountains (the rest: some landscapes already in urban areas).

    Of course the residents are upset again because it's affecting the landscape. They've already got their way with the factory, but of course they can't get enough (little anecdote: we recently got 50-meter-high masts - electricity - through the forest. Nobody asked us). Let's see who wins the game this time. The advantage should be with CEZ, they've already given in once.

    The cable car will have its own part or will be a large part of the environmental impact study. The newspaper report also confirms: Summer= DFS, FID= until the end of the year.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
18.0¢
Change
-0.010(5.26%)
Mkt cap ! $37.34M
Open High Low Value Volume
19.0¢ 19.5¢ 17.0¢ $35.92K 197.7K

Buyers (Bids)

No. Vol. Price($)
2 25000 18.0¢
 

Sellers (Offers)

Price($) Vol. No.
21.0¢ 20000 1
View Market Depth
Last trade - 15.47pm 17/06/2025 (20 minute delay) ?
EMH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.