ok, here's a few to consider:
Water - Where will the water come from in winter? Low rainfall in the summer months.
Services for UG - you have to go through permafrost, so heated piping is needed for backfill, water, compressed air. Didn't see any detail in the DFS on that!
Crushing and Grinding - $100m (Direct) for a three stage crush and grind circuit of a 3.3Mtpa project. Not sure if that's real, think you might have to at least double the costs for that especially getting it Greenland. With a plant as big as proposed, not sure they have costed a shed big enough, including a backfill plant.
This project has seen 2 x DFS/BFS during high commodity price surges and can't get off the ground.
- Forums
- ASX - By Stock
- Ann: Citronen Project Update - Strategy for 2024
ok, here's a few to consider:Water - Where will the water come...
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IBG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.375M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 9985351 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 1410500 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 9985351 | 0.004 |
11 | 9923569 | 0.003 |
5 | 3449980 | 0.002 |
2 | 2500000 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 1410500 | 4 |
0.006 | 2806912 | 5 |
0.007 | 2858236 | 5 |
0.008 | 1306448 | 4 |
0.009 | 100000 | 1 |
Last trade - 16.12pm 17/05/2024 (20 minute delay) ? |
|
|||||
Last
0.5¢ |
  |
Change
0.000 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
0.5¢ | 0.5¢ | 0.5¢ | 15019 | ||
Last updated 15.34pm 17/05/2024 ? |
Featured News
IBG (ASX) Chart |
Day chart unavailable