"Why bother doing a detailed engineering phase when you can build it all off a feasibility study" OMG...sorry mate but they dont build mine infrastructure off the feasibility study .No they do civil engineering costings in the capital works. Known as a subsection within
I agree. Check preceding posts from Yatchy and Sandy. They clearly do not. Shame you didn't read the thread history.
"Plus usually until the mine is officially 'turned on' all expenses are capex."
I agree with this statement so not sure where you are coming from. Perhaps you had Ernie in your mouth at the time and were not thinking straight.
- Forums
- ASX - By Stock
- Ann: Citronen Receives Landmark 402A Designation from EXIM Bank
"Why bother doing a detailed engineering phase when you can...
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IBG (ASX) to my watchlist
|
|||||
Last
0.4¢ |
Change
-0.001(12.5%) |
Mkt cap ! $5.924M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $10.50K | 3.001M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
21 | 23725748 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 7397597 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
20 | 23059082 | 0.003 |
19 | 13955034 | 0.002 |
6 | 8299989 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 7397597 | 6 |
0.005 | 4300330 | 8 |
0.006 | 4860777 | 2 |
0.007 | 815300 | 4 |
0.008 | 606448 | 3 |
Last trade - 15.55pm 12/07/2024 (20 minute delay) ? |
Featured News
IBG (ASX) Chart |