I've compared this to the original announcements and this is what has been removed in the updates, highlighted in bold:
Announcement: Investor Presentation
This page has been removed:
![]()
Project Upside
- Fines circuit to treat lithium fines and middlings could
add 30,000 - 40,000t of export concentrate without
additional mining or crushing, fund out of cash flow,
quick payback.
Announcement: Excellent Results From Large Scale Metallurgical Test Work
- Recovery to immediately marketable concentrates from the DMS is 76.4% with an additional 21.8% reporting to secondary concentrates for future processing. This equates to about 129,000tpa of high grade coarse concentrate grading +6.4% Li2O at 1mtpa of feed.
- In addition, a total of 285,000t of fines and secondary concentrates, per million tonnes of feed, would be stockpiled for stage 2 processing or initially treated through the tantalum circuit.
- A circuit to treat the fines and secondary concentrates will be constructed after production commences and will be funded out of cash flow. This is expected to add ~45,000t of concentrate at limited
incremental cost.
- Forums
- ASX - By Stock
- TAW
- Ann: Clarification and Retraction
Ann: Clarification and Retraction, page-3
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)