WR1 5.56% 57.0¢ winsome resources limited

Ann: Clarification on Drilling - Update, page-86

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 786 Posts.
    lightbulb Created with Sketch. 471
    "Therefore, under a few assumptions including they have not drilled truly perpendicular to the pegmatite, the pegmatite true width is less than 23.6m. As below, if the intercepted length is not perpendicular to dip of the pegmatite and is 23.6m, to get the true width solving for x (solving for perpendicular), x must be smaller than 23.6m"


    Reading this back, this could cause some confusion as I was focused only on the 005A re-drill. The less than 23.6m only applies to the intercept in hole AD-22-005A. Because they had already hit pegmatite going back the other way, the true width of the pegmatite incorporated over both holes should be greater than 23.6m (additional red highlighted area). What the true width here is anyone's guess.

    https://hotcopper.com.au/data/attachments/4791/4791707-d0fe6e64b23fbb7f8a15ea0f6caafea7.jpg




 
watchlist Created with Sketch. Add WR1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.