That sounds like a level headed and sound analysis.
I have to agree, the repeated delay in DFS is bad and am more inclined to believe that something within the cost parameter assumption is off from the PFS, otherwise they would have been able to complete and release results of the study on time.
- Forums
- ASX - By Stock
- Ann: Clean TeQ Sunrise Project - Modification 6 Approval
That sounds like a level headed and sound analysis. I have to...
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SRL (ASX) to my watchlist
(20min delay)
|
|||||
Last
42.0¢ |
Change
-0.010(2.33%) |
Mkt cap ! $37.89M |
Open | High | Low | Value | Volume |
42.5¢ | 42.5¢ | 41.5¢ | $21.77K | 51.88K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 4251 | 42.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
47.0¢ | 1999 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 4251 | 0.420 |
1 | 25794 | 0.415 |
4 | 55000 | 0.400 |
2 | 37976 | 0.395 |
2 | 5950 | 0.390 |
Price($) | Vol. | No. |
---|---|---|
0.480 | 20833 | 1 |
0.485 | 250 | 1 |
0.500 | 11363 | 2 |
0.510 | 1500 | 1 |
0.515 | 18240 | 2 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
SRL (ASX) Chart |