CPV 3.61% 40.0¢ clearvue technologies limited

First comes ability to mass produce - tick ... then comes...

  1. 5,403 Posts.
    lightbulb Created with Sketch. 1247
    First comes ability to mass produce  - tick  ... then comes contracts

    “Our Building-Integrated Photovoltaics (BIPVs) can be produced on mass production lines without the need for glass manufacturers to make changes to their standardised lines – providing them with reduced capital costs, and less downtime between different product runs. By reducing fabrication and assembly times, we lower their costs and increase their production outputs and manufacturing plant capability, leading to lower cost products for end-customers

    read that a couple of times  
 
watchlist Created with Sketch. Add CPV (ASX) to my watchlist
(20min delay)
Last
40.0¢
Change
-0.015(3.61%)
Mkt cap ! $97.31M
Open High Low Value Volume
41.0¢ 41.0¢ 38.8¢ $103.1K 256.3K

Buyers (Bids)

No. Vol. Price($)
1 800 39.0¢
 

Sellers (Offers)

Price($) Vol. No.
40.0¢ 25797 1
View Market Depth
Last trade - 16.10pm 18/09/2024 (20 minute delay) ?
CPV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.