First comes ability to mass produce - tick ... then comes contracts
“Our Building-Integrated Photovoltaics (BIPVs) can be produced on mass production lines without the need for glass manufacturers to make changes to their standardised lines – providing them with reduced capital costs, and less downtime between different product runs. By reducing fabrication and assembly times, we lower their costs and increase their production outputs and manufacturing plant capability, leading to lower cost products for end-customers
read that a couple of times
- Forums
- ASX - By Stock
- Ann: ClearVue demonstrates mass-scale manufacturing
First comes ability to mass produce - tick ... then comes...
-
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CPV (ASX) to my watchlist
(20min delay)
|
|||||
Last
40.0¢ |
Change
-0.015(3.61%) |
Mkt cap ! $97.31M |
Open | High | Low | Value | Volume |
41.0¢ | 41.0¢ | 38.8¢ | $103.1K | 256.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 800 | 39.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
40.0¢ | 25797 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 800 | 0.390 |
1 | 8659 | 0.385 |
1 | 20000 | 0.380 |
2 | 10000 | 0.375 |
1 | 25000 | 0.355 |
Price($) | Vol. | No. |
---|---|---|
0.400 | 25797 | 1 |
0.415 | 98759 | 3 |
0.420 | 53700 | 2 |
0.425 | 56400 | 2 |
0.430 | 38748 | 1 |
Last trade - 16.10pm 18/09/2024 (20 minute delay) ? |
Featured News
CPV (ASX) Chart |