GBZ 10.0% 0.9¢ gbm resources limited

Forgot to add - assuming a planned 250m hole to be drilled, if...

  1. 4,876 Posts.
    lightbulb Created with Sketch. 3898
    Forgot to add - assuming a planned 250m hole to be drilled, if it takes longer than a week then something is wrong with the rig or hole, or they have elected to take the drill hole deeper than planned.
 
watchlist Created with Sketch. Add GBZ (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.001(10.0%)
Mkt cap ! $10.41M
Open High Low Value Volume
1.0¢ 1.0¢ 0.9¢ $6.817K 715.0K

Buyers (Bids)

No. Vol. Price($)
2 771103 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.1¢ 233773 1
View Market Depth
Last trade - 12.07pm 05/07/2024 (20 minute delay) ?
GBZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.