GBZ 10.0% 0.9¢ gbm resources limited

Forgot to add - assuming a planned 250m hole to be drilled, if...

  1. 4,830 Posts.
    lightbulb Created with Sketch. 3851
    Forgot to add - assuming a planned 250m hole to be drilled, if it takes longer than a week then something is wrong with the rig or hole, or they have elected to take the drill hole deeper than planned.
 
watchlist Created with Sketch. Add GBZ (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.001(10.0%)
Mkt cap ! $10.41M
Open High Low Value Volume
1.0¢ 1.0¢ 0.9¢ $22.55K 2.343M

Buyers (Bids)

No. Vol. Price($)
2 1141145 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 382 1
View Market Depth
Last trade - 16.10pm 24/05/2024 (20 minute delay) ?
Last
0.9¢
  Change
-0.001 ( 10.0 %)
Open High Low Volume
1.0¢ 1.0¢ 0.9¢ 1756250
Last updated 15.55pm 24/05/2024 ?
GBZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.