PV1 0.00% 2.2¢ provaris energy ltd

Ann: CNG Pipe-to-Pipe Transportion Project Economics, page-85

  1. 4,853 Posts.
    lightbulb Created with Sketch. 2739
    Wouldn't hurt @luckstrike

    Pipeline distances are one thing, but depth of the ocean floor becomes the real sticking point in terms of the economics of installing a pipeline. Certainly becomes more viable if multiple sites can tap into the pipeline, however I don't think that GEV is targeting those operators that have the lucky of this consideration.

    Plenty of rigs in the sea / operators that would enjoy the additional revenue stream for 20+ years!
 
watchlist Created with Sketch. Add PV1 (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
0.000(0.00%)
Mkt cap ! $13.83M
Open High Low Value Volume
2.4¢ 2.4¢ 2.1¢ $7.644K 327.4K

Buyers (Bids)

No. Vol. Price($)
2 249293 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.5¢ 116714 3
View Market Depth
Last trade - 15.22pm 30/08/2024 (20 minute delay) ?
PV1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.