CNQ 9.09% 25.0¢ clean teq water limited

LithiumBank announces updated Boardwalk project...

  1. 248 Posts.
    lightbulb Created with Sketch. 31
    LithiumBank announces updated Boardwalk project PEAresults:

    LithiumBankthis week announced an update to its June 2023 PEA for the Boardwalk oil fieldbrine project in Alberta, Canada.

    The study incorporates Go2Lithium continuous ion-exchange DLE technology thataccording to bench-scale testing yields 98% to produce a 3.24 g/L Li eluate inlithium sulphate.

    The 34,000 tpa lithium hydroxide plant would operate over 20 years, costing$2.16B to build and $4,588/t LHM ($5,213/t LCE) to operate. The project’sindicated resource from the Leduc formation averages 71.6 mg/L Liconcentration.

    Using a flat price of $26,000/t LMH ($29,545/t LCE), the NPV8% comes in atUS$2.31B post-tax, up 39% from the previous PEA.

    Adamas take:Reagent costs are notoriously high for ion-exchange DLE, however, the incorporation of the novel continuous DLE technology out of Australia has reduced reagent costs from $3,689/t LHM to $1,089. The updated project is now more in line with competitors,though it remains a costly source of lithium units.

 
watchlist Created with Sketch. Add CNQ (ASX) to my watchlist
(20min delay)
Last
25.0¢
Change
-0.025(9.09%)
Mkt cap ! $17.40M
Open High Low Value Volume
28.5¢ 29.0¢ 25.0¢ $82.51K 313.0K

Buyers (Bids)

No. Vol. Price($)
1 2500 25.5¢
 

Sellers (Offers)

Price($) Vol. No.
27.0¢ 20000 1
View Market Depth
Last trade - 15.27pm 21/06/2024 (20 minute delay) ?
CNQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.