Yes BG, I noticed that too, but not an area of expertise for me so taking the STFU option. I might add if you look carefully at the reported costs in the DFS and compare them with what you know is required to get the job done, even allowing for the obvious reality that there will be stuff we cannot see, it would seem there is far more potential to beat the budget than blow it. Everything I can think of that could be a potential technical issue in making the mechanics of this mine happen would seem to be well covered, and conservatively so. Quote me on this in two years' time, and let's see how that all panned out...
- Forums
- ASX - By Stock
- Ann: Coburn Mineral Sands Project Zircon Concentrate Price
Yes BG, I noticed that too, but not an area of expertise for me...
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online