Grain size will not be a factor in feed rates to the wet concentrator plant. If there is an issue, it is to ensure the contract miner is feeding ore of sufficient quality, but there are well-established ways to deal with that.
- Forums
- ASX - By Stock
- STA
- Ann: Coburn Mineral Sands Project Zircon Concentrate Price
Ann: Coburn Mineral Sands Project Zircon Concentrate Price, page-8
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online