SPQ 18.2% 0.9¢ superior resources limited

Hole 1 CCDD001 might be onto somethingThis seems to me to be the...

  1. 32 Posts.
    lightbulb Created with Sketch. 24
    Hole 1 CCDD001 might be onto something
    This seems to me to be the current drilling locations (Fig 2) which does not correspond to the planned drilling locations (see below Fig 12). Looking closely at the longitude grid (which also does not correspond), it is only the end of hole 1 CCDD001 {245m to 254.2m (end of hole depth)} which passes on the eastern edge of the chargeability target (Holes 2 and 4 don't). We find bornite-magnetite-biotite mineralisation here which I assume contributes to the chargeability possibly due to copper. (Bornite - It is important as an ore for its copper content of about 63 percent by mass). Looking forward to more drilling and assays especially those into the chargeability target proper.
    https://hotcopper.com.au/data/attachments/5492/5492232-1993c4a1cb20e2ba10197be89b573d8d.jpg

    https://hotcopper.com.au/data/attachments/5492/5492241-034669ec6c7fd22814b8c777fc0a4594.jpg


 
watchlist Created with Sketch. Add SPQ (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
-0.002(18.2%)
Mkt cap ! $18.01M
Open High Low Value Volume
1.0¢ 1.0¢ 0.9¢ $18.53K 2.055M

Buyers (Bids)

No. Vol. Price($)
1 68862 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 2005661 2
View Market Depth
Last trade - 13.35pm 05/09/2024 (20 minute delay) ?
SPQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.