BEACH PETROLEUM NL 2002-07-25 ASX-SIGNAL-G
HOMEX - Adelaide
+++++++++++++++++++++++++
Beach Petroleum advises that the results of the DST 1 conducted this
morning are as follows:
DST 1:
2058.1 - 2071.7 metres in the Patchawarra Formation
TEST TYPE:
Conventional Off Bottom Drill Stem Test
RESULT:
Oil to surface in 13 minutes at a preliminary rate of 1780 barrels of
oil per day through a (1/2)" surface choke. the flowing Wellhead
pressure was steady at 177 psi. there were no indications of water.
Participants in the PEL 92 Joint venture are:
Beach Petroleum NL (Operator) 75%
Cooper Energy NL 25%
R Nelson
MANAGING DIRECTOR
- Forums
- ASX - By Stock
- BPT
- OIL OIL OIL announcement
OIL OIL OIL announcement
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BPT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.72 |
Change
0.005(0.29%) |
Mkt cap ! $3.883B |
Open | High | Low | Value | Volume |
$1.72 | $1.73 | $1.69 | $13.58M | 7.943M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 220395 | $1.72 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.72 | 9529 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 220395 | 1.715 |
6 | 124520 | 1.710 |
7 | 154330 | 1.705 |
2 | 58501 | 1.700 |
4 | 97184 | 1.695 |
Price($) | Vol. | No. |
---|---|---|
1.720 | 9529 | 1 |
1.725 | 4999 | 1 |
1.730 | 171097 | 10 |
1.735 | 172015 | 7 |
1.740 | 230501 | 10 |
Last trade - 16.10pm 21/05/2024 (20 minute delay) ? |
|
|||||
Last
$1.72 |
  |
Change
0.005 ( 0.81 %) |
|||
Open | High | Low | Volume | ||
$1.72 | $1.73 | $1.69 | 1909084 | ||
Last updated 15.59pm 21/05/2024 ? |
Featured News
BPT (ASX) Chart |
The Watchlist
AUQ
ALARA RESOURCES LIMITED
Stephen Gethin, Non-Executive Director & Chairman
Stephen Gethin
Non-Executive Director & Chairman
Previous Video
Next Video
SPONSORED BY The Market Online