Correct at this stage we don't know the departure date although the first barge would be loaded now in my opinion. 6.5 days to Taboneo plus a day to load onto ship. So the contract with SGE if I remember correctly is 40% on loading ship and then final 10% upon issue of Quality and Quantity certificates. Therefore this will occur after 1 April 2024.
Second barge should be loaded before 31 March but god knows if the 50% payment happens over long weekend? Asia/Indonesia has holiday for Good Friday but not Easter Monday.
- Forums
- ASX - By Stock
- CKA
- Ann: Cokal Receives Payment from Loading 7,500 tonnes of Coal
Ann: Cokal Receives Payment from Loading 7,500 tonnes of Coal, page-47
-
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add CKA (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.9¢ |
Change
0.002(2.60%) |
Mkt cap ! $85.23M |
Open | High | Low | Value | Volume |
8.1¢ | 8.1¢ | 7.6¢ | $13.40K | 174.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 19503 | 7.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.0¢ | 238455 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 9236 | 0.076 |
2 | 267000 | 0.071 |
2 | 147700 | 0.070 |
1 | 76923 | 0.065 |
1 | 25000 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.081 | 112804 | 1 |
0.082 | 100000 | 1 |
0.084 | 394999 | 2 |
0.085 | 102083 | 2 |
0.089 | 40750 | 1 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
CKA (ASX) Chart |