CKA 0.00% 9.8¢ cokal limited

Correct at this stage we don't know the departure date although...

  1. 11,767 Posts.
    lightbulb Created with Sketch. 1426
    Correct at this stage we don't know the departure date although the first barge would be loaded now in my opinion. 6.5 days to Taboneo plus a day to load onto ship. So the contract with SGE if I remember correctly is 40% on loading ship and then final 10% upon issue of Quality and Quantity certificates. Therefore this will occur after 1 April 2024.
    Second barge should be loaded before 31 March but god knows if the 50% payment happens over long weekend? Asia/Indonesia has holiday for Good Friday but not Easter Monday.
 
watchlist Created with Sketch. Add CKA (ASX) to my watchlist
(20min delay)
Last
9.8¢
Change
0.000(0.00%)
Mkt cap ! $105.7M
Open High Low Value Volume
9.8¢ 9.8¢ 9.6¢ $18.03K 186.6K

Buyers (Bids)

No. Vol. Price($)
3 62056 9.6¢
 

Sellers (Offers)

Price($) Vol. No.
9.8¢ 291448 2
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
CKA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.