You are funny man
Go back and read the announcement again.
They have 2 barges.
They can load 7500 tonnes together per trip.
They have said the round trip will take 15 days from Batu Tuhup to River mouth and back
One month on average has 30 days
This means the barges can do 2 trips a month on average
This also means the barges can move 15,000 tonnes a month on average.
This obviously assumes that there will no non-navigable days, or delays in loading and unloading.
- Forums
- ASX - By Stock
- CKA
- Ann: Cokal Receives Payment from Loading 7,500 tonnes of Coal
Ann: Cokal Receives Payment from Loading 7,500 tonnes of Coal, page-26
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CKA (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $113.2M |
Open | High | Low | Value | Volume |
10.5¢ | 10.5¢ | 10.0¢ | $72.76K | 721.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 134232 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 88209 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 134232 | 0.100 |
1 | 100000 | 0.099 |
1 | 5154 | 0.097 |
2 | 57000 | 0.095 |
1 | 30000 | 0.094 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 88209 | 3 |
0.110 | 449526 | 7 |
0.115 | 1109645 | 10 |
0.120 | 898055 | 7 |
0.125 | 300000 | 2 |
Last trade - 16.10pm 08/05/2024 (20 minute delay) ? |
|
|||||
Last
10.5¢ |
  |
Change
0.000 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
10.5¢ | 10.5¢ | 10.0¢ | 126271 | ||
Last updated 14.50pm 08/05/2024 ? |
Featured News
CKA (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online