CKA 2.63% 7.4¢ cokal limited

Yes a preparation plant/washplant required to get the 7% product...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 12,269 Posts.
    lightbulb Created with Sketch. 1519
    Yes a preparation plant/washplant required to get the 7% product ash for coking coal. The original plan was to mine the Pit 1 and Pit 2 PCI coal at about 5% ash from memory. Pits 3 & 4 coking coal were to be mined after a preparation plant was constructed. One can only speculate why Pit 3 was the starting point?
 
watchlist Created with Sketch. Add CKA (ASX) to my watchlist
(20min delay)
Last
7.4¢
Change
-0.002(2.63%)
Mkt cap ! $79.84M
Open High Low Value Volume
7.5¢ 7.8¢ 7.2¢ $82.88K 1.128M

Buyers (Bids)

No. Vol. Price($)
2 200000 7.2¢
 

Sellers (Offers)

Price($) Vol. No.
7.8¢ 57954 2
View Market Depth
Last trade - 15.41pm 14/11/2024 (20 minute delay) ?
CKA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.