CKA 3.75% 7.7¢ cokal limited

Ann: Cokal to Develop Underground Coal Production at the BBM Mine, page-409

  1. 12,215 Posts.
    lightbulb Created with Sketch. 1503
    Yes a preparation plant/washplant required to get the 7% product ash for coking coal. The original plan was to mine the Pit 1 and Pit 2 PCI coal at about 5% ash from memory. Pits 3 & 4 coking coal were to be mined after a preparation plant was constructed. One can only speculate why Pit 3 was the starting point?
 
watchlist Created with Sketch. Add CKA (ASX) to my watchlist
(20min delay)
Last
7.7¢
Change
-0.003(3.75%)
Mkt cap ! $83.07M
Open High Low Value Volume
8.0¢ 8.0¢ 7.0¢ $151.4K 2.064M

Buyers (Bids)

No. Vol. Price($)
2 34955 7.2¢
 

Sellers (Offers)

Price($) Vol. No.
7.7¢ 99999 1
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
CKA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.