The product qualification facility is likely the old laboratory...

  1. 397 Posts.
    lightbulb Created with Sketch. 635
    The product qualification facility is likely the old laboratory facility from Christoph Frey, which was operated for a period of time in Germany as a "pilot plant." The equipment fits into a container. Presumably, the equipment needs to be cleaned, the container shipped, and a plot of land with electricity and water connections found in Australia to re-establish the facility. Then, a fluffy announcement: "Product Qualification Facility built and ready to run," and Andrew can celebrate once again.
    It would be better to let the container in Germany and place it in Schwarzheide or Ludwigshafen on the BASF ground to conduct tests together with the new MOU partner BASF.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
28.5¢
Change
0.005(1.79%)
Mkt cap ! $129.4M
Open High Low Value Volume
28.5¢ 28.5¢ 27.5¢ $26.24K 93.32K

Buyers (Bids)

No. Vol. Price($)
3 17754 27.5¢
 

Sellers (Offers)

Price($) Vol. No.
28.5¢ 8413 1
View Market Depth
Last trade - 16.10pm 24/06/2025 (20 minute delay) ?
EGR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.