The product qualification facility is likely the old laboratory facility from Christoph Frey, which was operated for a period of time in Germany as a "pilot plant." The equipment fits into a container. Presumably, the equipment needs to be cleaned, the container shipped, and a plot of land with electricity and water connections found in Australia to re-establish the facility. Then, a fluffy announcement: "Product Qualification Facility built and ready to run," and Andrew can celebrate once again.
It would be better to let the container in Germany and place it in Schwarzheide or Ludwigshafen on the BASF ground to conduct tests together with the new MOU partner BASF.
- Forums
- ASX - By Stock
- EGR
- Ann: Collaboration with BASF on Anode Recycling
Ann: Collaboration with BASF on Anode Recycling, page-58
Featured News
Add EGR (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.0¢ |
Change
0.015(10.3%) |
Mkt cap ! $72.64M |
Open | High | Low | Value | Volume |
15.0¢ | 16.0¢ | 14.8¢ | $42.78K | 276.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 34627 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 195929 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 114273 | 0.145 |
6 | 177127 | 0.140 |
6 | 219704 | 0.135 |
6 | 252115 | 0.130 |
1 | 200000 | 0.125 |
Price($) | Vol. | No. |
---|---|---|
0.160 | 195929 | 6 |
0.165 | 72000 | 1 |
0.170 | 14881 | 2 |
0.180 | 67124 | 4 |
0.185 | 3865 | 1 |
Last trade - 15.59pm 31/05/2024 (20 minute delay) ? |
|
|||||
Last
16.0¢ |
  |
Change
0.015 ( 10.3 %) |
|||
Open | High | Low | Volume | ||
15.0¢ | 16.0¢ | 15.0¢ | 63716 | ||
Last updated 15.29pm 31/05/2024 ? |
Featured News
EGR (ASX) Chart |