EGR 10.3% 16.0¢ ecograf limited

Ann: Collaboration with BASF on Anode Recycling, page-58

  1. 181 Posts.
    lightbulb Created with Sketch. 272
    The product qualification facility is likely the old laboratory facility from Christoph Frey, which was operated for a period of time in Germany as a "pilot plant." The equipment fits into a container. Presumably, the equipment needs to be cleaned, the container shipped, and a plot of land with electricity and water connections found in Australia to re-establish the facility. Then, a fluffy announcement: "Product Qualification Facility built and ready to run," and Andrew can celebrate once again.
    It would be better to let the container in Germany and place it in Schwarzheide or Ludwigshafen on the BASF ground to conduct tests together with the new MOU partner BASF.
 
watchlist Created with Sketch. Add EGR (ASX) to my watchlist
(20min delay)
Last
16.0¢
Change
0.015(10.3%)
Mkt cap ! $72.64M
Open High Low Value Volume
15.0¢ 16.0¢ 14.8¢ $42.78K 276.7K

Buyers (Bids)

No. Vol. Price($)
1 34627 15.5¢
 

Sellers (Offers)

Price($) Vol. No.
16.0¢ 195929 6
View Market Depth
Last trade - 15.59pm 31/05/2024 (20 minute delay) ?
Last
16.0¢
  Change
0.015 ( 10.3 %)
Open High Low Volume
15.0¢ 16.0¢ 15.0¢ 63716
Last updated 15.29pm 31/05/2024 ?
EGR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.