don't forget the cost of waste stripping will not be incurred in the lower layers...it will be included in the $1.3b npv.
- Forums
- ASX - By Stock
- Ann: Colluli Drilling and Feasibility Update
don't forget the cost of waste stripping will not be incurred in...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)