These wells are drilled tangentially into the formation and do not require hydraulic fracturing, therefore the cost to drill and complete these wells is generally less than $1 million per well.
Our current focus is on maintaining production levels whilst significantly reducing our costs to keep our cash flows strong during this down-turn in global oil prices. We have stripped out approximately $1 million of our overhead costs, including Company-wide salary reductions, and are well positioned to ride out this low oil price storm.
- Forums
- ASX - By Stock
- Ann: Colorado Operational Update
These wells are drilled tangentially into the formation and do...
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
KAI
Pilbara Minerals buys land off Kairos part of its York gold project for $20M – and a 2% royalty on any PLS gold sales
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit