a few months ago i wouldnt have thought you will be far off with that guestimate pilko3. i was thinking around the $10 mark when G1A+B were operational and selling, however am thinking it will be between $5-10 after watching how the market has reacted to the current scale up of CS2.
i am fully aware that the scaling up of CS2 and G1A+B are at different stages of the companies growth and the building of G1a+B indicates demand and market confidence, but its clear to me that there are a lot of nervous investors that sell as soon as henny penny starts clucking about anything.
when (if) dividends and construction of G2 are announced thats when it will be boom time IMHO......... would love to see multiple stages built simultaneously in the future.
still sticking with my plan, sell 30% of holdings @$5 fund deposit on a small farm and (hopefully) live of dividends of remaining holdings
- Forums
- ASX - By Stock
- EDE
- Ann: Colorado Production Scale-up Update
Ann: Colorado Production Scale-up Update, page-176
-
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EDE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.216M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $2.085K | 1.042M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1727888 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 33095361 | 22 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 1727888 | 0.002 |
39 | 101175058 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 33095361 | 22 |
0.004 | 5420102 | 4 |
0.005 | 1200000 | 3 |
0.006 | 245010 | 2 |
0.008 | 3804000 | 2 |
Last trade - 11.39am 08/11/2024 (20 minute delay) ? |
Featured News
EDE (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online