TVN 6.00% 4.7¢ tivan limited

Ann coming?, page-6

  1. 4,485 Posts.
    lightbulb Created with Sketch. 3132
    The Mount Peake Feasibility Study is on track to be completed in the next few weeks, with the results anticipated to be announced in July. An integral part of the Feasibility Study completion is the current TIVAN® Pilot Plant testwork underway at the CSIRO in Perth. Full completion of all aspects of this work is expected by the end of June, with results to be reported following review.

    So likely a couple more weeks
 
watchlist Created with Sketch. Add TVN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.