About frickin time!
I'm not sure how others feel about it but the fact that the DFS was delayed by ~8 months has meant that production will be set back by about the same time frame.
The DFS would have been completed by now and production in 1Q15 would've been possible.
If a saving of at least $50m on CAPEX is not found and better numbers on OPEX, then IMO it was an absolute waste of time for an 8 month review of the PFS.