Had to wait 8 months for 2 weeks of drilling.
Previous post probably says it better.
- Forums
- ASX - By Stock
- Ann: Commencement of Drilling at Mt Mansbridge
Had to wait 8 months for 2 weeks of drilling.Previous post...
-
- There are more pages in this discussion • 144 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RMX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.873M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $25 | 25K |
Featured News
RMX (ASX) Chart |