GRV 40.0% 5.1¢ greenvale energy ltd

To date, progress of the project is reflected in the Test...

  1. 1,569 Posts.
    lightbulb Created with Sketch. 478
    To date, progress of the project is reflected in the Test Program 3 results contained in the GRV announcement dated 17.05.2023. These results confirm that the Bitumen yield from liquefaction will be significantly higher than that from the superseded Pyrolytic process, and that the yields from Torbanite and Cannel Coal are nearly the same;
    "During Test Program Three, a maximum conversion of 67.3wt% was achieved for the CannelCoal portion of the Alpha Resource, 65.9wt% conversion was achieved for the Torbanite
    portion of the Resource and 66.3wt% conversion was achieved for a blended sample".

    A further liquefaction test, Test Program 4 is currently underway and it is expected that there will be additional  improvement in conversions.
 
watchlist Created with Sketch. Add GRV (ASX) to my watchlist
(20min delay)
Last
5.1¢
Change
-0.034(40.0%)
Mkt cap ! $22.45M
Open High Low Value Volume
8.4¢ 8.4¢ 5.1¢ $195.4K 3.319M

Buyers (Bids)

No. Vol. Price($)
6 100000 5.1¢
 

Sellers (Offers)

Price($) Vol. No.
5.3¢ 50000 1
View Market Depth
Last trade - 16.10pm 07/06/2024 (20 minute delay) ?
Last
5.1¢
  Change
-0.034 ( 39.4 %)
Open High Low Volume
8.4¢ 8.4¢ 5.1¢ 733835
Last updated 15.59pm 07/06/2024 ?
GRV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.