The speed at which these guys drill holes, they probably complete the scoping study before they finish drilling.
First hole started over 6 months ago, we have seen 3 assays, by time they finish 12 holes here, scoping study will be done DFS will be done, they might be able to build ponds and a plant before they get these 12 holes done.
Incredibly slow people not great at doing things and they now trying to take on a scoping study.
- Forums
- ASX - By Stock
- LEL
- Ann: Commencement of Lithium Brine Scoping Study at Solaroz
Ann: Commencement of Lithium Brine Scoping Study at Solaroz, page-3
-
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
30.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $34.16M |
Open | High | Low | Value | Volume |
31.0¢ | 31.0¢ | 30.5¢ | $28.58K | 92.72K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 33000 | 30.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
31.0¢ | 11035 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 33000 | 0.305 |
1 | 12000 | 0.300 |
1 | 3448 | 0.290 |
2 | 37280 | 0.280 |
2 | 23846 | 0.260 |
Price($) | Vol. | No. |
---|---|---|
0.310 | 11035 | 1 |
0.330 | 6076 | 1 |
0.335 | 10000 | 1 |
0.340 | 12567 | 2 |
0.350 | 7300 | 3 |
Last trade - 13.18pm 18/09/2024 (20 minute delay) ? |
Featured News
LEL (ASX) Chart |