CBE 2.56% 7.6¢ cobre limited

Ann: Commencement of Process Design Scoping Study for Ngami, page-2

  1. 1,504 Posts.
    lightbulb Created with Sketch. 761

    "METShas a strong experience base in In-Situ leaching including work on both copper and uranium projects"

    'The copper-silver mineralisation is estimatedbetween 103 and 166Mt @ 0.38 to 0.46% Cu1
 
watchlist Created with Sketch. Add CBE (ASX) to my watchlist
(20min delay)
Last
7.6¢
Change
-0.002(2.56%)
Mkt cap ! $25.82M
Open High Low Value Volume
7.6¢ 7.6¢ 7.6¢ $2.113K 27.80K

Buyers (Bids)

No. Vol. Price($)
1 136676 7.6¢
 

Sellers (Offers)

Price($) Vol. No.
7.7¢ 30000 1
View Market Depth
Last trade - 10.03am 19/06/2024 (20 minute delay) ?
CBE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.